Gmail Calendar Documents Reader Web more »
Recently Visited Groups | Help | Sign in
Google Groups Home
Group info
Recent pages and files
Canal Street (upper)    

Canal Street Redevelopment Program
"Shelton River Front Development"
November 2006

 

Public Hearing:  November 28 at 7:00 pm in City Hall.

 

Sites "A" through "G" are shown on the clickable map below.  Click on the map below to see enlargements, photos and more info. 

 

Site Density:  Total area: 11.8 acres.  Total number of residential units: 634. Commercial space: 88,000 s.f.

 

Canal Street:  Sites "G1",  "G2" and "H" consist of new parking lots or garages located on the west side of Canal Street. Portions of the existing canal would be filled in and replaced with parking areas.  Property located along the canal is owned by the Canal Company.  In addition, the existing street will be widened.

 

The Riverwalk: The proposed Riverwalk extension is shown along the riverfront for the entire length of the development except for Site "A" (the Birmingham).  This existing building there extends right to the river's edge (see video below) so locating the Riverwalk along the river at the Birmingham would be technically challenging.  

 

Resources:

Site Plan 8 1/2" x 11" (Word Document) (for easy printing)

See the Conservation Commission video of their site walk on August 2, 2006.  Titles have been added to the video that key the locations they are walking through with those shown in the site plan.  

 

Below is a clickable image.  Click on a section of the map below to learn more about that part of the development, see enlarged maps, and photos.

 

 

Version: 
Create a group - Google Groups - Google Home - Terms of Service - Privacy Policy
©2009 Google